Name | : | Prof.Dr.Ir. Abdul Hakim Halim, M.Sc. |
Professor | ||
: | ahakimhalim@mail.ti.itb.ac.id | |
Research Group | : | Manufacturing System |
Field of Interest | : | 1. Production Scheduling |
: | 2. Group Technology | |
: | 3. Manufacturing System Design and Optimization | |
4. Applied Operation Research | ||
Education | : | 1. Doctor (University of Osaka, Japan) |
: | 2. Master (Institut Teknologi Bandung, Indonesia) | |
: | 3. Undergraduate (Institut Teknologi Bandung, Indonesia) | |
Awards:
- Satyalancana Karya Satya XXX Tahun, 2018
- Penghargaan 25 Tahun ITB, 2012
- Satyalancana Karya Satya XX Tahun, 2007
- Satyalancana Karya Satya X Tahun, 2004
Publication
International Journal
- Prasetyaningsih, E., Suprayogi, Ari Samadhi, T.M.A., & Halim, A.H., “Production and delivery batch scheduling with multiple due dates to minimize total cost“, Journal of Engineering and Technological Sciences. 2017. 49 (1), pp. 16-36. DOI: 10.5614/j.eng.technol.sci.2017.49.1.2 Scopus
- Hidayat, N.P.A., Cakravastia, A., Samadhi, T.M.A.A., Halim, A.H., “A batch scheduling model for m heterogeneous batch processor“, International Journal of Production Research 54 (4), pp. 1170-1185, (Scopus) 2016
- Zahedi, Z., Ari Samadhi, T.M.A., Suprayogi, S., Halim, A.H., “Integrated batch production and maintenance scheduling for multiple items processed on a deteriorating machine to minimize total production and maintenance costs with due date constraint“, International Journal of Industrial Engineering Computations
7 (2), pp. 229-244, (Scopus) 2016
- Prasetyaningsih, E., Suprayogi, Samadhi, T.M.A.A., Halim, A.H., “Production and delivery batch scheduling with a common due date and multiple vehicles to minimize total cost“, IOP Conference Series: Materials Science and Engineering 114 (1), 012079 (Scopus) 2016
- Yusriski, R., Sukoyo, S., Ari Samadhi, T.M.A., Halim, A.H., “Integer batch scheduling problems for a single-machine with simultaneous effects of learning and forgetting to minimize total actual flow time“, International Journal of Industrial Engineering Computations 6 (3), pp. 365-378 (Scopus) 2015
- Halim, A.H., Miyazaki, S., Ohta, H., “Batch-scheduling problems to minimize actual flow times of parts through the shop under JIT environment“, European Journal of Operational Research
72 (3), pp. 529-544, (Scopus) 1994
- Halim, A.H., Miyazaki, S., Ohta, H., “Lot scheduling problems of multiple items in the shop with both receiving and delivery just in time“, Production Planning and Control 5 (2), pp. 175-184, (Scopus) 1994
International Proceedings :
- Yusriski, R., Sukoyo, Samadhi, T.M.A.A., Halim, A.H., “An Integer Batch Scheduling Model for a Single Machine with Simultaneous Learning and Deterioration Effects to Minimize Total Actual Flow Time“, IOP Conference Series: Materials Science and Engineering 114 (1), 012073 (Scopus) 2016
- Setiawan, A., Wangsaputra, R., Martawirya, Y.Y., Halim, A.H., “An FMS Dynamic Production Scheduling Algorithm Considering Cutting Tool Failure and Cutting Tool Life“, IOP Conference Series: Materials Science and Engineering 114 (1), 012052, 2016 (Scopus)